IMAGE

Fig. 19

ID
ZDB-IMAGE-231005-51
Source
Figures for Cano-Ferrer et al., 2023
Image
Figure Caption

Fig. 19

Main connections of the control board. a. Boards and wires required for the final installation and wiring of the OptoPi. b. Data and power connections on the control board. c. Connections on the illumination platform. d. Connections on the stimulation platform.

Acknowledgments
This image is the copyrighted work of the attributed author or publisher, and ZFIN has permission only to display this image to its users. Additional permissions should be obtained from the applicable author or publisher of the image. Full text @ HardwareX